NETWORK RAIL

22nd July 2016

A complex fibre backbone connecting four buildings and two car parks all delivered and tested within one week.

test61

This major project required the installation of backbone fibres to connect all buildings in the complex, which comprises four identical buildings and two car parks. The buildings are joined by an underground pit system that connects all the communications rooms, located in each building and car park.

Our professional engineers installed blown fibre duct between all the buildings using interconnecting ducts before blowing a 96 core fibre from Building One to the communications rooms in each of the other buildings, then linked the two car parks.

The 96 fibre cable ― incorporating 960 fibres in total ― was then terminated and tested in one week by three Networx3 specialist engineers.

Darren Sullivan, Director at Able Data Installations, said: “I would like to express my thanks to Networx3 for the excellent work recently carried out at Network Rail and Conde Nast. It was noticeable how conscientious and flexible your engineers were throughout.”

FOR A HONEST ASSESSMENT OF YOUR NEEDS CALL TODAY

01254 888361

INFO@NETWORX3.CO.UK