Blown Fibre Optic Installation

Blown Fibre Optic Installation

All our Blown Fibre Optic Installations are performed by Security Checked Engineers

Want to learn more about our services?

Why Use Networx3 ?

  • Safe Contractor registered
  • All Work Completed by our own 'in house trained' & security cleared operatives
  • Work Completed With a 'Right First Time' Philosophy
ISOQAR Alcumus Safe Contractor Approved  Fibreoptic Industry Association Corporate Member Living Wage Employer Disability Confident Committed

Networx3 are a Security Cleared Blown Fibre Optic Contractor

All our blown fibre optic installations are performed by Security Checked (SC) and Developed Vetting (DV) status Engineers and are carried out to the highest possible standard.

What is Blown Fibre Optic Installation?

A blown fibre optic installation is a cabling solution using glass fibre optic cables, blown through a ducting pipe. The main ducting pipe can have up to 19 micro ducts contained within it. A coated “blow able” optical fibre is blown through a micro duct using compressed air. Carried by viscous drag, the fibres are lifted into the airstream and away from the wall of the micro duct, eliminating friction even around the tightest bends. One Fibre optic strand can carry 10 gigabytes of data every second or over 30,000 telephone conversations.

500-Preparing-to-install-Blown-Fibre

Simplified Fibre Optic Installation Planning

The ground works to install the network only has to be done once. When the waterproof ducting is in place the network can be expanded by simply blowing more fibres, or blowing the old fibre out and bigger fibres in. We are currently blowing up to 288 fibres into a single duct, but we expect to be blowing over 1000 fibres within twelve months.

Cost Effective Installation

The system uses a compressed air installation method and is capable of blowing single coated fibres or bundles of fibre through a route of bends and twists. The fibre units are only blown into the ducts as they are needed, allowing the blown fibre system to develop as network needs expand. You only need to pay for the expansion to your network as your business grows.

blown1-500

Speed of Fibre installation

With a conventional copper system it would typically take a minimum of a four-person team three days to complete a 3,000-foot installation. With a blown fibre optic installation, a two-man team can carry out teh work in less than one day after the micro-ducts are installed.

Want to learn more about our services?

Networx3 are Security Cleared Engineers : All of our engineers have either SC or DV security clearance.

At Networx3 we pride ourselves on being vastly experienced in a broad range of ABF solutions from several of the top Global manufacturers

We can offer the expertise to provide support and guidance to our clients to make sure the fibre optic installation infrastructure is the most efficient and cost effective solution to meet the customer demands for now and in the future.

We are expert installers of fibre optic cable installations

with highly trained engineers using the latest tools and techniques in the installation process. Our aim is to get every job right first time, using careful planning and preparation which includes caring for the environment.

Why Use Networx3 ?

ISOQAR Alcumus Safe Contractor Approved  Fibreoptic Industry Association Corporate Member Living Wage Employer Disability Confident Committed

Get in touch today

Speak with one of our qualified team to discuss your requirements